1. Executive Summary

  • The system carries today’s load, but once the number of customers doubles, reporting and the order flow are expected to become bottlenecks.
  • The most urgent risks are in security and continuity: the database backups have never been tested with a restore, and the admin panel is open to everyone.
  • There is no need for a rewrite. The recommended path is to split the existing monolith into modules and harden it step by step over 6 months.

2. Scope and Method

Duration
5 business days
Reviewed
The main application’s codebase (~120k lines), the database schema, the server and deployment infrastructure
Interviews
4 interviews with the tech lead, two developers and the operations lead
Tools
Code review, query plans (EXPLAIN ANALYZE), dependency and security scans, load profiling

3. Findings

Ranked by impact and urgency.

  1. #1CriticalContinuityEstimated effort: 1 day

    Daily backups are taken but have never been tested with a restore; the backups sit on the same server.

    Impact: A disk failure would lose both the data and the backups.

    Recommendation: Move the backups to a separate location and run a restore test every month.

  2. #2CriticalSecurityEstimated effort: 2 days

    The admin panel is open to the internet, with no two-factor authentication and no limit on login attempts.

    Impact: A brute-force attack could reach all customer data.

    Recommendation: Put the panel behind a VPN or an IP restriction and add 2FA and rate limiting.

  3. #3HighPerformanceEstimated effort: 3 days

    The monthly report query scans an unindexed table from start to finish (38 s on average).

    Impact: The order screens slow down while the report runs.

    Recommendation: Two composite indexes, and reading the report from a summary table prepared overnight.

  4. #4HighArchitectureEstimated effort: 4-6 weeks

    The order, stock and billing code writes directly to each other’s tables.

    Impact: A change in one module breaks the others; new features are getting slower.

    Recommendation: Draw the module boundaries and route communication between modules through a single service layer.

  5. #5MediumMaintenanceEstimated effort: 2 weeks

    The framework is two major versions behind; 14 dependencies have known vulnerabilities.

    Impact: Security updates cannot be applied, and the upgrade gets harder every month.

    Recommendation: Upgrade the dependencies first, then the framework, one version at a time.

  6. #6MediumTeamEstimated effort: 2-3 weeks

    Automated test coverage is 8%; deployment is manual and depends on one person.

    Impact: Nothing can go live while that person is away; bugs are noticed by customers.

    Recommendation: E2E tests for the critical flows and an automated deployment pipeline.

4. Target Architecture

  • It stays a single application (a modular monolith); orders, stock, billing and reporting are separate modules.
  • Reporting reads from summary tables that do not load the main database.
  • The admin panel is on the internal network; deployment is automated and can be rolled back.

5. Migration Plan

  1. First 30 days

    Close the risks

    • Backups and a restore test
    • Admin panel security
    • Speeding up the report query
  2. 1-3 months

    Harden the foundation

    • Dependency and framework upgrades
    • Tests for the critical flows
    • Automated deployment pipeline
  3. 3-6 months

    Split into modules

    • Separating the order and stock modules
    • Moving billing to the service layer
    • Architecture documentation and handover to the team

Would you like this report for your own software? An architecture review takes 5-7 business days.